logo

Our Strategies At Work Are The Means By Which To Achieve The Desired Goals, And Achieve Your Goals And Dreams Here.

Request a Quote Request a Quote
Contact Info

+(02) 0114-9912-318

+(02) 0111-7457-354

Hello@example.com

support@yourwebsite.com

US - Los Angeles 5135 - 4234

In The Center Street Name Here

Monday - Fraiday, 9am - 5pm,

Saturday & Sunday - CLOSED

Chat on WhatsApp

Furan Mortar

Overview

Furan Resin Mortar is widely used for Acid Resistant Bricks & Tiles lining works as Bedding & Jointing Mortar for Tanks, Floor, Drain, Foundation, Chemical Reaction Vessels, and Neutralization Pit etc.

services
services
services

Resistant

It is resistant to Non-Oxidizing Acids, Alkalies, Salt, Solvents, Greases, Detergents and Oils. Carbon Filled Furan Mortar is to be used to resist hot & highly concentrated alkalies, Hydrofloric Acid, Flourid Salted etc.

Resistant to temperature

170° C (Max.)

Preparation of Mortar

Preparation of Mortar generally consists of Solution & Powder. In order to obtain good working consistency, the average mixing ratio is 1 Pbw of Solution & 3 pbw of Powder. This ratio will slightly vary depending upon the temperature and working conditions.

Prepare small batches of Mortar. Stirrer the Solution thoroughly before use. Place the Solution in a suitable mixing pan and add powder in it. Mix thoroughly with a spatula or Trowel. The mixing operation shall be continued until a uniform mixture is obtained.

Make sure that all the Mortar is used from the mixing pan before another batch is prepared.

Surface Preparation

The cement plastered surface shall be slightly rough in line & level , dry & clean, free from dust, dirt, grease, oil etc., maintaining required slope etc. as no slope can be adjusted or altered in Acid proof lining works.

Setting / Curing

Furan Resin Mortar is a Self-hardening due to its chemical reaction which occurs when the Powder & Resin are mixed together.

  • An initial setting occurs in 6 to 8 hrs. at 30°C
  • Final Setting occurs in 24 to 48 hrs. at 30°C
  • Curing time: 7 days at 30°C

Please ensure that no water shall be spilled over the bricks lining works before it completely cured.

Storage Life

  • Solution: 12 Months at the temperature 30°C (+2OC)
  • Powder: 6 Months at the temperature 30°C (+2OC)

All two components are stored in cool and dry place under the roof until ready to use it original unopened (Sealed) containers.

Packing

  • Solution: 25 Kg. in M.S. Drum
  • Powder: 37.50 Kg. in Plastic Bag